Draw it rough.
It straightens when you lift.
FieldWorX Sketch turns a thumb sketch over live satellite imagery into an as-built the city will accept. Ten to twenty a day, in gloves, in the sun, often with no signal.
Book a walkthrough
One field platform, shipped in order.
Sketch first, because the as-built is the record everything else hangs on. Each app ships when it holds up in the field, not before.
- 01
Sketch
Building nowAs-built drawings. Draw over live satellite imagery, tag every fitting, export the two-sheet PDF.
- 02
Inspect
NextInspection modules, sold one at a time, so a system buys only the inspections it actually runs.
- 03
Inventory
In designWarehouse stock in and out, tied to the same lot numbers the crew already scanned in the field.
- 04
Orders
Coming soonWork orders, compliance review, and reporting. The full workforce platform, once the first three are running in the field.
The two-minute as-built.
One service install at 35 Broad St, cold open to exported PDF. These are the real screens, in order, with the clock running.
- 0:04 Cold open on your jobs The one you were on is at the top with a Resume button.
- 0:12 The address resolves to live satellite Frame what gets captured, then draw on it.
- 0:35 Drawn and straightened Main along the street, service to the house, structure outlined.
- 1:20 Scans fill the fitting records Barcodes read at the tee become manufacturer and lot data.
- 1:55 Export. The filename writes itself. Two sheets: the drawing, then the fitting schedule.
Every step works with no signal. The upload waits for a bar of service and then goes on its own.
What the crew draws is what is in the ground.
Sheet one is the drawing over the imagery the crew framed on site. Sheet two is the fitting schedule: item, size, manufacturer and lot for every fitting placed.
Lawrenceville_35-Broad-St_WO-48219_2026-08-01_asbuilt.pdfWhy this exists.
Pencil is running out of road.
Crews sketch the as-built on paper, photograph it, and upload the photo to a work order. Cities are refusing hand drawings and asking for CAD-clean output. Real CAD is unusable standing over an open trench.
Every fitting is a federal record.
Manufacturer and lot data for each fitting and every foot of pipe feeds PHMSA Form 7100.1-1 and the operator's distribution integrity management plan. Today it is retyped by hand from barcodes that were already scanned once in the field.
Three sets of hands, one record.
A municipal system, an investor-owned utility, and the contractor working for both all touch the same as-built. One output covers all three, so the drawing that leaves the field is the drawing everyone files.
- 0
- bars of signal needed to finish an as-built
- 20
- as-builts a crew can turn in a day
- 1
- federal form filed every year, built from exactly this data
Come see it draw.
Twenty minutes. We take a real address, draw the as-built end to end, and export the sheet. Then you tell us where it breaks.
- info@fieldworxhq.com
Message sent
Thanks, we reply the same day.